تقیزاده، د. و مومیوند ح (1991) برآورد خرج ویژه و خردایش سنگ در زون شماره ٣ معدن آهک رشکان ارومیه، سـی و یکمین همایش علوم زمین، سـازمان زمینشناسی و اکتشافات معدنی کشور.
علوینائینی، م. و شهرابی، م (1364) نقشه زمینشناسی با مقیاس 1:250000 ارومیه، سازمان زمینشناسی و اکتشافات معدنی کشور.
Bailey, A. D (1975) Rock types and seismic velocities versus rippability, Nimbus Instruments.
Basarir, H., and Karpuz, C (2004) A rippability classification system for marls in lignite mines. Engineering geology, 74 (3): 303-318.
Bin Mohamad, E. T., Saad, R., Noor, M. M., Isa, M. F. B. M., and Mazlan, A. N (2010) Excavatability Assessment of Weathered Sedimentary Rock Mass Using Seismic Velocity Method. Proceedings AIP Conference Proceedings, Volume 1325, AIP, p. 132-136.
Chehreghani, S. H., Alipour, A., and Eskandarzade, M (2011) Rock mass excavatability estimation using artificial neural network. Journal of the Geological Society of India, 78 (3): 271.
Copur, H., Rostami, J., Ozdemir, L., and Bilgin, N (1997) Studies on performance prediction of roadheaders based on field data in mining and tunneling projects. in Proceedings Int, 4: 4A1-4A7.
Franklin, J. A., Broch, E., and Walton, G (1971) Logging the mechanical character of rock.
Goktan, S (1991) Prediction of ripping machine performance in terms of rockmass properties. Civil Engineering= Siviele Ingenieurswese, 33(1): 13-14.
Iphar, M (2016) Continuous Rating for Diggability Assessment in Surface Mines. in Proceedings IOP Conference Series: Earth and Environmental Science, Volume 44, IOP Publishing, p. 052056.
Iphar, M., and Goktan, R (2006) An application of fuzzy sets to the Diggability Index Rating Method for surface mine equipment selection. International journal of rock mechanics and mining sciences, 43(2): 253-266.
Kirsten, H (1982) Efficient use on construction of tractor mounted rippers. Civil Engineering= Siviele Ingenieurswese, 25(5): 247-263.
MacGregor, F., Fell, R., Mostyn, G., Hocking, G., and McNally, G (1994) The estimation of rock rippability. Quarterly Journal of Engineering Geology and Hydrogeology, 27 ( 2): 123-144.
McCann, D., and Fenning, P (1995) Estimation of rippability and excavation conditions from seismic velocity measurements. Geological Society, London, Engineering Geology Special Publications, 10 (1): 335-343.
Pettifer, G., and Fookes, P (1994) A revision of the graphical method for assessing the excavatability of rock. Quarterly Journal of Engineering Geology and Hydrogeology, 27 (2): 145-164.
Scoble, M., and Muftuoglu, Y (1984) Derivation of a diggability index for surface mine equipment selection. Mining Science and Technology, 1(4): 305-322.
Weaver, J. M (1975) Geological factors significant in the assessment of rippability. Civil Engineering= Siviele Ingenieurswese, 17(12): 313-316.